SOP for the Operation of VORTEX MIXTURE
1.0 PURPOSE
This document details the procedure for the Operation of VORTEX MIXTURE
2.0 SCOPE
This procedure is to be applied at the time of Operation of VORTEX MIXTURE
3.0 RESPONSIBILITY
Persons along with their responsibilities are given below:
S. No | Designation | Responsibility
|
01 | Analyst | To prepare the SOP and follow the SOP. |
02 | Section In Charge | To ensure implementation of SOP. |
03 | Quality Assurance Incharge | To ensure implementation of SOP. |
4.0 PROCEDURE
4.1 OPERATION
4.1.1 Switch on the main power supply.
4.1.2 Put on the closed container on plate.
4.1.3 Switch on instrument switch.
4.1.4 Set the speed (low/ or high) as required for that time
4.1.5 Switch off the instrument switch
4.1.6 Switch off the main power supply
4.2 CLEANING
4.2.1 Clean the instrument with Clean Cloth.
4.3 Precaution:
4.3.1 Hold the container at such an angle that it should not slip from hands of the user & the breakage should be avoided.
4.3.2 Beware of the accidents.
5.0 ABBREVIATION
QC Quality Control
SOP Standard Operating Procedure
6.0 REFERENCE
6.1 Based on Demonstration given by the Services Engineer
Recorded The Data on Appendix I format No.
APPENDIX I
LOG BOOK FOR VORTEX MIXTURE
Name of the Instrument : VORTEX MIXTURE
Location :
S. No. | Date | Sample | Test | Report no | Analysed By | Checked by | Remarks |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
0 Comments: