1.0 PURPOSE

This document details the procedure for the Operation of  VORTEX MIXTURE

2.0 SCOPE

This procedure is to be applied at the time of Operation  of VORTEX MIXTURE

3.0 RESPONSIBILITY

Persons along with their responsibilities are given below:

S. No

Designation

Responsibility

 

01

Analyst

To prepare the SOP and follow the SOP.

02

Section In Charge

To ensure implementation of SOP.

03

Quality Assurance Incharge

To ensure implementation of SOP.


4.0 PROCEDURE

4.1 OPERATION

4.1.1 Switch on the main power supply.

4.1.2 Put on the closed container on plate.

4.1.3 Switch on instrument switch.                                           

4.1.4 Set the speed (low/ or high) as required for that time

4.1.5 Switch off the instrument switch

4.1.6 Switch off the main power supply

4.2  CLEANING

4.2.1 Clean the instrument with Clean Cloth.

4.3 Precaution:

4.3.1 Hold the container at such an angle that it should not slip from hands of the user & the breakage should be avoided.

4.3.2 Beware of the accidents.

5.0 ABBREVIATION

QC Quality Control 

SOP Standard Operating Procedure

6.0 REFERENCE

6.1 Based on Demonstration given by the Services Engineer

Recorded The Data on Appendix I format No.

APPENDIX I

LOG BOOK FOR VORTEX MIXTURE 

Name of the Instrument   : VORTEX MIXTURE

Instrument ID No.            : 

Location                           :

 

S. No.

 

Date

Sample

Test

Report no

Analysed By

Checked by

Remarks

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0 Comments: